Monday, April 14, 2014

Construction Notice: Two-day on-ramp closure at Mission Blvd.

The westbound Mission Blvd. to northbound I-680 on-ramp in the Warm Springs neighborhood of Fremont will be closed between 10 p.m. on Wednesday night April 16 through 6 a.m. on Saturday morning, April 19 to install a large slip joint.

The slip joint to be installed is designed to absorb up to 6.5 feet
of movement during a major earthquake.

The red line shows the on-ramp subject to closure.
Detour Information 
To detour during this on-ramp closure, use Warm Springs Blvd. (North), and make a right at Auto Mall Parkway to merge onto the I-680 North.

Trucks should take the Warm Springs Blvd. detour or turn left at Durham Rd. to access I-680 before the Mill Creek bridge.