Friday, September 27, 2013

Nugget Way Re-Opened to Traffic

Today our crews paved and re-opened Nugget Way for traffic. The street was closed in order to install a length of water pipeline.

 A second pipeline will also be installed in upcoming months, but will only extend from Mission Boulevard to Nugget Way and will not require additional street closures.

After the completion of all construction activities, Nugget Way will be paved again to improve appearance and durability.

Above: A backhoe excavated near 
Nugget Way last week. The pipeline 
in the foreground is now installed 
beneath the street.


Wednesday, September 11, 2013

Construction Update: Nugget Closure Extended Through September 27

The Nugget Way closure between Omega Drive and Tissiack Way will continue through September 27 to allow for paving.

UPDATE: Nugget Way will stay closed through Friday, September 27, in order to install a length of water pipeline beneath the street.

Detour Information: Drivers may use Paseo Padre Parkway and the U-turn on Mission Boulevard to detour between Omega Drive and Tissiack Way. Pedestrians have access between the streets using the sidewalk on Paseo Padre Parkway.

For your safety, do not cross through the construction site on Nugget Way.

Red Line: Nugget Way closure
Yellow Line: Recommended traffic detour

If you have questions or concerns, please call our 24-hour answering service at 866-973-1476.

Para información en español, por favor llame 866-973-147

Wednesday, September 4, 2013

Five Day Closure of Nugget Way and Weekend Construction on Mission Boulevard

There are two upcoming construction activities which will affect the surrounding area outside of regular work hours.

1. From Monday, September 9 through Friday, September 13, Nugget Way will be closed between Omega Drive and Tissiack Way.

In order to install a length of water pipeline beneath the street, Nugget Way will be closed for five days. The closure will start shortly after 7 a.m. on Monday, September 9. Nugget Way will be re-paved and open to traffic by 7 p.m. on Friday, September 13.

Detour Information: Drivers may use Paseo Padre Parkway and the U-turn on Mission Boulevard to detour between Omega Drive and Tissiack Way. Pedestrians have access between the streets using the sidewalk on Paseo Padre Parkway.

Red Line: Temporarily affected portion of Nugget Way
Yellow Line: Recommended traffic detour
Blue area: Location of weekend construction work

2. Weekend work will take place south of Mission Boulevard between 9 a.m. and 4 p.m. on the following days: Saturday, September 7; Sunday, September 8; Saturday, September 14 and Saturday, September 21.

This work is related to installation of a vault which will allow crews to access the new water pipeline in the future. The roadside work will be done by excavators and a crane, and will not affect traffic on Mission Boulevard.

If you have questions or concerns, please call our 24-hour answering service at 866-973-1476.

Para información en español, por favor llame 866-973-1476